Mason, the director of engineering at Frost Inc. was very impressed that Blake, a production engineer, had not missed a single day of work in the past 12-month period. Mason rated Blake very high on all dimensions of his performance appraisal just based on this one aspect of Blake’s performance. This error in the performance appraisal process is known as a__________.