The amount of resources used in an activity-based costing (ABC) system for a specific activity is computed by multiplying the ______________ (chapter 10) A. cost driver rate and the actual cost driver volume B. cost driver rate and the planned cost driver volume C. overhead rate and the actual cost driver volume D. overhead rate and the planned cost driver volume